MGO SGSLR dome is installed and passes Site Acceptance Testing

The MGO SGSLR dome installation occurred January 22nd through the 25th with the Site Acceptance Testing successfully completed on the 25th. Participating in the installation was a four-person team from the manufacturer, Baader Planetarium, as well as Howard Donovan (KBR), Alice Nelson (KBR) and Jan McGarry (NASA/GSFC). Also there for this installation was Ole Klingan from the Norwegian Mapping Authority (Kartverket). Ole was on the trip to prepare for the September installation of the same type of dome at the SGSLR facility at Ny-Ă…lesund. Not on the trip, but critical to the planning and execution of the installation, was the KBR SGSLR manager, Scott Wetzel (KBR). The SGSLR team would like to thank the University of Texas at Austin for their continued support of the SGSLR work.

SGSLR shelter (building to the right) before the dome installation. The black dome ring wall can clearly be seen atop the SGSLR shelter. The legacy MLRS SLR system with its radar on top is to the left in the picture.
Lift of the dome ring onto the dome ring wall.
Lift of the dome onto the dome ring. The McDonald Observatory 82" and 107" telescope facilities can be seen on top of Mt Locke in the background to the left in the picture.