October 15, 2019 The MGO SGSLR shelter walls were installed on the SGSLR pad on October 15th. This picture shows the first wall panel going into place. The first wall panel going into place The dome ring wall was added after the building walls and roof were in place. The shelter after the dome ring wall was added Work continues on the framing, electrical, ducting and other parts of the interior. Framing and electrical work inside the shelter